Leon Oblak and Jože Kropivšek and Igor Lipušček (2003) Setup time reduction on four-side planing machine with the SMED method. Zbornik gozdarstva in lesarstva (71). pp. 91-105. ISSN 0351-3114
PDF - Published Version Download (249Kb) |
Official URL: http://www.forestry.bf.uni-lj.si/
Abstract
Due to the rapidly increasing diversity of products and smaller batch sizes, the setup time reduction is of crucial importance for the profitability of a company. The article deals with the problem of long setup times in a wood company and possibilities for the solution with the SMED method. On a practical case, the setup time reduction on four-side planing machine was analysed.
Item Type: | Article |
---|---|
Keywords: | wood industry company, four-side planing machine, setup times, SMED method |
Link to COBISS: | http://www.cobiss.si/scripts/cobiss?command=SEARCH&base=COBIB&select=ID= 1122697 |
Divisions: | Biotechnical Faculty, Department of Wood Technology > Chair of management and economics of wood enterprises and product development |
Item ID: | 294 |
Date Deposited: | 11 Mar 2014 09:44 |
Last Modified: | 11 Mar 2014 09:44 |
URI: | http://eprints.gozdis.si/id/eprint/294 |
Actions (login required)
View Item |